A self-levelling compound gave a flat base for the large tiles in a room only 1.4 m wide.
Project overview
Small rooms need the most careful setting-out.
A powder room floor in 600 × 1200 porcelain, centred on the doorway so the cuts at each wall are even.
Project scope
- 01Floor levelling compound
- 02600 × 1200 porcelain floor
- 03Threshold transition strip
- 04Skirting silicone line
How the work is done
A controlled sequence, not guesswork on the wall.
Every stage is checked before the next begins — the finish is only as good as the work underneath it.
- 01
Assess the substrate
Check flatness, junctions, fixtures and wet-area readiness before the layout is committed.
- 02
Set out the complete room
Balance tile courses and control visible cuts, corners and transitions.
- 03
Fix and align
Maintain adhesive transfer, consistent joints and alignment across adjoining surfaces.
- 04
Finish and inspect
Complete grout, movement joints, silicone and a final cleaning check.
Project gallery
Overall view and installation details.
Photographs are shown in working order. Select any image to view it full screen.